İMKB Değerleri
  • USD2.34 USD
  • EURO2.79 EURO
  • Altın88.81 Altın
  • Benzin4.19 Benzin
  • İMKB 30122,129.41 İMKB 30
  • IMKB 10099,547.68 IMKB 100

SON Dakika

  • Eklenme Tarihi :
  • 30 Eylül 2014, Salı 17:27

Ferhat Bridge were put into service

follow
Ferhat Bridge were put into service
0/10 (0 person)
Facebook Twitter

Ferhat bridge built by Amasya Municipality began to serve .

Amasya news:
bridge's official opening on October 18 , Prime Minister Ahmet Davutoglu made ​​by stating that Amasya Mayor Cafer Ozdemir, \"Building on the past begin in December Ferhat Bridge, work came to an end and the bridge opened to traffic ,\"he said .
Station Street'the return from the unilateral opened the bridge on 4 legs 3-stage steel built as telling President Ozdemir, \"Edge clearance of 15 meters, the middle span of 30 meters. water feet in the length of each of the 20 meter piles were overlaid . bridges carrier system the base and feet of reinforced concrete , pedestrian and vehicle platform as steel construction was placed . Roadway total width of 10 meters, sidewalk width of 5 meters for a total width of 15 meters was built as , \"he said .
Özdemir, Scientific Affairs Manager Tuncay Yörükoğlu found in the examination of the bridge .
FERHAT KÖPRÜSÜ HİZMETE GİRDİ


FERHAT KÖPRÜSÜ HİZMETE GİRDİ

Ferhat Bridge were put into service" comments for.

RELATED NEWS

TOP NEWS
COMMENTS
copyright 2013 Habermonitor.com